St. Joseph’s Hospital Cancer Center

Kingston, Jamaica New Cancer CenterVarian TrueBeam In an effort to bring world class healthcare to Jamaica, it was time for St. Joseph’s Hospital to update and renovate an entire building dedicated to cancer treatment and research. Services included new construction design in order to accommodate state-of-the-art radiation vaults, CT scanning technology and X-ray equipment. Designs […]

Cornwall Regional Hospital Cancer Center

Montego Bay, Jamaica Vault AdditionVarian TrueBeam Delivering state-of-the art cancer treatment to the Jamaican community was the primary goal for the Cornwall Regional Cancer Center. Very proud to bring first world treatment to the island, hospital officials required designs that would renovate an existing building to house innovative technology such as a Linear Accelerator and […]

Slidell Memorial Cancer Center*

Slidell, Louisiana New Regional Cancer Center The treatment of cancer requires multiple specialties, leading-edge diagnostic capabilities, and varied treatment protocols. Having all of this in one facility enables the treatment team to collaborate with each other. A cancer center such as this gives the patients a better, full-service treatment facility when it provides space for […]

First Medical Moore Regional Cancer Center

Pinehurst, North Carolina Equipment Upgrade211X with BrainLab First Health Moore Regional Hospital Cancer Center replaced their linear accelerator with a new model. Human Element Architects designed the vault renovations required to contain the equipment and residual radiation of the linear accelerator. The design required removal of the old equipment, installation of the new equipment and […]

AnMed Health Cancer Center

Anderson, South Carolina Equipment UpgradeVarian TrueBeam Phased vault renovation of an existing 1,500 sq. ft. linear accelerator treatment vault. The renovation also included new control consoles for the linear accelerator vaults and HDR vault. Project Details1,500 square feet

John B. Amos Cancer Center

Columbus, Georgia Multiple Equipment UpgradeTrueBeam, BrainLab, Edge Human Element Architects created designs for three different vault renovations and one CT room renovation. Two existing linear accelerators were replaced with new Varian TrueBeam linacs, one added BrainLab. The third vault replaced the existing linear accelerator with Varian Edge. Project DetailsVault 1 – Varian TrueBeam with BrainLab, […]

RMC Health Systems*

Anniston, Alabama New Regional Cancer CenterProposed Human Element Architects designed a 21,000 sf, two-floor, comprehensive Cancer Center. The space would include Radiation Oncology, Medical Oncology, and Women’s Health departments. The building would also require administration space, office space, engineering and pharmaceutical operations. Project Details21,000 square feetNew building

University Cancer and Blood Center

Athens, Georgia Equipment UpgradeVarian TrueBeam with BrainLab Human Element Architects designed the renovation of a 1,720 sq ft area that included the removal and replacement of a Varian TrueBeam linear accelerator and the control console. Project Details1,720 square feet

Rock Hill Radiation Therapy Center

Rock Hill, South Carolina Equipment UpgradeVarian TrueBeam Human Element Architects was tasked to design the renovation of an existing linear accelerator vault, control console, and support spaces in order to install new equipment. Project Details1,200 square feet

Health City Cayman Islands

Grand Cayman, Cayman Islands Equipment UpgradeVarian TrueBeam Design of a new 5,600 sq. ft. freestanding cancer center to be located at a destination hospital in the Caribbean. The vault is designed to allow for total body irradiation and includes a planned expansion for a PET/CT. Project Details5,600 square feet addition